The Kichi Alay 1632KW HPP project is for the completion ribbon-cutting ceremony
来源: | Writter:Aaron | Time:2026-09-10 | 7 click: | 🔊 点击朗读正文 ❚❚ | 分享到:

This is our Kichi-Alai HPP Project (Phase I) located in Kyrgyzstan, with an installed capacity of 1,632 kW. The officials from Osh City and heads of the local power authority will come to the site to attend the ribbon-cutting ceremony tomorrow. The President of Kyrgyzstan will also join the ceremony via live online connection. These photos were sent back by our technical specialists, who have completed the on-site installation and commissioning of the equipment.



CONSTRUCTION
CONTACT US
info@maxhydropower.com
ABOUT US
SERVICE
NEWS
https://www.maxhydropower.com
SHANDONG MAX HYDRO POWER EQUIPMENT LTD.
Yunchuangjingu Building No.1 Kuiwen District,Weifang,Shandong,China
+86 18678036889 / +86 18605365898
+86 15306362292