Our new Phase I Generator Production Base Project
Construction Scale: Covering a land area of approximately 1.03 hectares with a total construction area of about 10,323 square meters
Investor: Shandong Max Hydro Power Equipment Ltd., with a total investment of around 50 million RMB
Building Composition: One standardized heavy steel structure workshop with a floor area of 9,000 square meters, which can meet relevant production demands. This project will
serve as Shandong Max Hydro Power Equipment Ltd. for one of the primary manufacturing base in Shandong Province, specializing in the production and fabrication of generators
and water turbines supporting hydro power plants.
After the project is finished, it will be fully equipped with large vertical lathes, large horizontal lathes and heavy-duty CNC machining centers. Leveraging Weifang’s regional
advantages in machinery processing, the base can fulfill domestic and overseas hydro power equipment orders efficiently with high quality standards.
Construction Period: Estimated at 8 months.The project is expected to create 30 to 50 local jobs, achieve an annual output value exceeding 100 million RMB, and generate annual
tax payments of over 10 million RMB.



