The surveying team is working intensively at the local HPP project site
来源: | Writter:bernie | Time:2025-06-03 | 346 click: | 🔊 点击朗读正文 ❚❚ | 分享到:

According to the requirements of customers and the collection requirements of on-site data of the design institute, our measurement team is carrying out intensive on-site measurement work, collecting data for on-site approval and following details, which will be used by the design institute to carry out further design work.


                                                                                                                  

                                                                                                                                                                      

                                                                                                                                                                       

CONSTRUCTION
CONTACT US
info@maxhydropower.com
ABOUT US
SERVICE
NEWS
https://www.maxhydropower.com
SHANDONG MAX HYDRO POWER EQUIPMENT LTD.
Yunchuangjingu Building No.1 Kuiwen District,Weifang,Shandong,China
+86 18678036889 / +86 18605365898
+86 15306362292