1.8M diameter turbine unit with a total capacity of 1450KW routine maintenance
来源: | Writter:bernie | Time:2025-01-06 | 325 click: | 🔊 点击朗读正文 ❚❚ | 分享到:

1.8M diameter turbine unit with a total capacity of 1450KW routine maintenance,there are 6 pcs Kaplan turbine generator units with 3.5m water head.

                                                                                         

                                                                                                                                                     

                                                                                                                                                      

                                                                                                                                                      

86 18678036889 / 86 0536 2450158(8:00-17:00)    86 18605365898(17:00-08:00)
PROJECT
SHANDONG MAX HYDRO POWER EQUIPMENT LTD.
Yunchuangjingu Building No.1 Kuiwen District,Weifang,Shandong,China
SERVICE
https://www.maxhydropower.com
info@maxhydropower.com
ABOUT US
NEWS
CONSTRUCTION